INSTITUTIONAL DATA ROOM // HKE + CLP 22kV ALIGNMENT, CAPITAL & 12 FILINGS (HKD)

22 kV Open-Standard EV Terminal, Capitalization & Dual-Utility Traction

Complete engineering and institutional data room: featuring our 21–22 October 2026 HK Electric alignment (Permanent Concrete Customer Substation at FFL ≥ +7.0 mPD housing N × 1,500 kVA transformers), our confirmed 28 October 2026 Microsoft Teams meeting with CLP Power Marine eMobility, our HK$ 3,198,000 Phase 0–1 R&D budget (93.5% grant coverage), and HK$ 20,000,000 Phase 2 ITC ESS 1:1 co-matching structure.

✓ ARCHIVED FIELD RECORD // HKE WALKOVER (21–22 OCT) & CLP TEAMS CALL (28 OCT 2026)

HK Electric Sheung Wan Walkover Outcome & CLP Cross-Harbour Synchronization

Following our on-site walkover at Sheung Wan Landing No. 1 (21 Oct 2026) and engineering call with Mr. Ting of HK Electric Distribution Planning (22 Oct 2026), HKE confirmed that our permanent EV ferry terminal will incorporate a Concrete Customer Substation at FFL ≥ +7.0 mPD housing N × 1,500 kVA transformers fed by 22 kV HV from the adjacent Sheung Wan 132/22 kV Zone Substation. On 26 Oct 2026, CLP Power’s Marine eMobility division scheduled our Microsoft Teams alignment call for 28 Oct 2026 (10:00 AM) to synchronize Kowloon and New Territories landing nodes.

Inspect +7.0 mPD Terminal Specification ↓
01. HKE PERMANENT SUBSTATION Concrete Sub @ FFL ≥ +7.0 mPD +3.2m above +3.8 mPD seawall (PD & FSD statutory approvals)
02. HKE 1,500 kVA TRANSFORMER BANK 1 → 3 → 6 × 1,500 kVA Units 1.5 MVA (Ph1) → 4.5 MVA (3.5MW MCS) → 9.0 MVA (2050 Fleet)
03. CLP & LANDSD/EEB PROGRESS CLP Teams Call (28 Oct 10:00 AM) Kowloon/NT 22kV Sync + LandsD (STT) & EEB Policy Routing
Annotated HKE Walkover Decision Sheet FIELD RECORD 01 // ANNOTATED SHEET Click to Enlarge ↗

On-Site Walkover Notes (Sheung Wan No. 1)

Records HKE engineer notes: "1 set TP/HVDP", "4.7 (L) × 2.5 × 3m (H)", "1.6m clearance all round", and "Land status! Ask for sea" confirming greenfield land allocation as the primary trigger.

HK Electric Drawing P505/00/R2 Plan HKE DRAWING // P505/00/R2 (PLAN) Click to Enlarge ↗

HKE Baseline Pillar & Cable Trench Plan

Baseline single-unit specification (P505/00/R2); upgraded per Mr. Ting (22 Oct) to a permanent Concrete Customer Substation at FFL ≥ +7.0 mPD housing N × 1,500 kVA transformers.

HK Electric Transformer Pillar Elevations HKE DRAWING // SIDE C & D ELEVATION Click to Enlarge ↗

HKE Enclosure Elevation Profile (3.0m Height)

Side 'C' (4500mm width) and Side 'D' (3000mm height) elevation blueprints provided on-site by HK Electric at Sheung Wan Landing No. 1.

FULL-STACK MARITIME INFRASTRUCTURE // OPEN-STANDARD 22 kV EV TERMINAL & HUB-AND-SPOKE NETWORK

Sheung Wan 2-Story EV Terminal Specification (FFL ≥ +7.0 mPD Concrete Substation)

Incorporating HK Electric Distribution Planning’s 22 October 2026 engineering requirements (Mr. Ting) and synchronized with CLP Power Marine eMobility (28 Oct Teams session), our Sheung Wan Greenfield Terminal is engineered as an open-standard marine charging hub ("the Supercharger of Victoria Harbour" using CharIN MCS / IEC 61851-23-3 & ISO 15118-20). Located 150m from Sheung Wan MTR Exit D and the Macau Ferry Bus Terminus, it combines a Ground-Floor AC Passenger Lounge (+3.8 mPD) with a Flood-Protected Upper-Deck Concrete Customer Substation (FFL ≥ +7.0 mPD) housing modular 1,500 kVA transformers.

ARCHITECTURAL CROSS-SECTION // 2-STORY FLOOD-PROTECTED 22 kV TERMINAL (DOC REF: AM-SWT-7MPD-2026) 150m to Sheung Wan MTR Exit D & 132/22 kV Zone Substation
2F: HKE CONCRETE CUSTOMER SUBSTATION (FFL ≥ +7.0 mPD) TX BAY 01 1,500 kVA TX BAY 02 1,500 kVA BAYS 03–06 4.5–9.0 MVA ▲ FFL ≥ +7.0 mPD STORM-SURGE FLOOD DATUM (+3.2m ELEVATED DECK) 1F: AC PASSENGER LOUNGE Octopus Fast-Gates & Air Curtain 150m Walk to Sheung Wan MTR Exit D 1.5 MWh LFP BESS 1,250V DC Busbar Zero Export Protection EXISTING SEAWALL GRADE: +3.8 mPD (SHEUNG WAN LANDING NO. 1) ◄ Direct 22 kV Underground Feeder (~150m to Sheung Wan 132/22 kV Zone Substation) 25m × 8m PONTOON 2×100kN Vacuum (12s) 3.5 MW CHARIN MCS ARM BAYWING EV
TERMINAL TABLE 01 // ONE UNIFIED OPEN-STANDARD BERTH

Universal Berth Compatibility (D2 → D5 → EF-150 & Third-Party Ferries)

CharIN MCS (IEC 61851-23-3) + ISO 15118-20
Phase 1: BAYWING-D2 (15.0m LOA | 25–40 Pax Shuttle)

400 kWh LFP Battery • Powered by Stage 1 HKE 1×1,500 kVA Transformer + 1.5 MWh BESS Buffer

500 kW – 1.0 MW Charge Turnaround: 5–6 Mins
Phase 2: BAYWING D3 / D4 / D5 (20m–28m | 120–400 Pax & Freight)

600 kWh – 1.4 MWh LFP Battery • Synchronized across Sheung Wan HKE Hub & CLP Kowloon/NT Hubs + 90s Cargo Swap

800 kW – 2.5 MW MCS Turnaround: 4–9 Mins
Phase 3+: BAYWING EF-150 & Open Third-Party Ferries (28.5m | 150 VIP Pax)

1.8 MWh 1,000V LFP Battery • Powered by 3×1,500 kVA (4.5 MVA) HKE Bank • Open-access ISO 15118-20 billing for all operators

3.5 MW+ Direct MCS Turnaround: 10–12 Mins
TERMINAL TABLE 02 // DUAL-UTILITY (HKE + CLP) NETWORK ROLLOUT

Territorial "Hub-and-Spoke" Energy Architecture (Zero Rural Grid CapEx)

HKE HK Island + CLP Kowloon/NT
TIER 1: URBAN 22 kV MEGAWATT HUBS (HKE Sheung Wan + CLP TST, Hung Hom & Tuen Mun) 3.5 MW+ MCS & BESS

Concentrates high-voltage infrastructure at primary urban terminals adjacent to existing zone substations: HK Electric’s Sheung Wan 132/22 kV Zone Substation (confirmed 21–22 Oct) and CLP Power’s Kowloon/NT waterfront nodes (Teams alignment scheduled 28 Oct).

TIER 2: OVERNIGHT ISLAND DEPOTS (Cheung Chau, Mui Wo & Discovery Bay) 400V Slow Overnight Trickle

Uses existing 400V low-voltage pier connections for slow 6–8 hour overnight cell-balancing while vessels are out of service—requiring zero submarine cable or island high-voltage substation upgrades.

TIER 3: UNPOWERED "TOUCH-AND-GO" SPOKES (Chi Ma Wan 芝麻灣, Peng Chau, Sha Lo Wan & Tai O) 0 kW Pier Power Needed

Vessels depart Tier 1 Urban Hubs at 85–90% State-of-Charge, perform 60-second passenger boarding stops at rural piers with zero shore-power draw, and recharge upon returning to the urban hub.

01. VC FUNDING & PUBLIC-PRIVATE CAPITALIZATION STRATEGY (HKD)

93.5% Non-Dilutive Leverage & Staged VC Architecture

Presented below in clean, single-ledger views: our HK$ 3,198,000 Phase 0–1 R&D budget (93.5% covered by non-dilutive HKSTP and ITF grants), our HK$ 2,990,000 public grant stack, and our staged private VC tranches (including 1:1 ITC ESS matching for Phase 2).

LEDGER 01 // PHASE 0–1 (18-MONTH INCUBATION): SIL, HIL & D1 PROTOTYPE

Compliance-Audited R&D Budget Breakdown

TOTAL PHASE 0–1 BUDGET HK$ 3,198,000

01. R&D Engineering Talent (ITF RTH Subsidized)

2x Full-Time Control Systems & Marine Mechatronics Engineers (100% covered via ITF RTH)

HK$ 1,450,000

02. Simulation Software & Multi-Physics Cloud

MATLAB/Simulink Control Toolboxes, Star-CCM+ / ANSYS CFD licenses, Gazebo/ROS2 compute

HK$ 280,000

03. HIL Benchtop & D1 Avionics/Sub-Scale Rig

NVIDIA Jetson Orin Nano, dual STM32H7 ECUs, SBG IMU, LiDAR sensors & carbon T-foil rig

HK$ 320,000

04. Systems Architecture, Project Management & Operational Runway

Principal Systems Architect leadership, HKE/CLP/HKMD regulatory interfacing & 18-mo runway

HK$ 720,000

05. Intellectual Property & Freedom-to-Operate

PCT & regional patent filings for 100Hz active foil stabilization & BESS telemetry (90% PAG)

HK$ 278,000

06. HKSTP Lab Setup, Marine Insurance & Tolo Trials

Science Park bench space, third-party marine test insurance, and Tolo Harbour slipway logistics

HK$ 150,000
93.5% NON-DILUTIVE COVERAGE RATIO

Net Unsubsidized Equity Gap: Only HK$ 208,000 (6.5%)

Public grants reimburse HK$ 2,990,000 of the HK$ 3,198,000 budget. Angel capital serves primarily as a low-risk working-capital reimbursement float.

PUBLIC GRANT STACK
HK$ 2.99M / 3.20M
15.4x Equity Leverage
LEDGER 02 // NON-DILUTIVE GOVERNMENT FUNDING

Leveraged Public Capital Stack (Phase 0–1: HK$ 2,990,000)

93.5% of Phase 0–1 Budget
01. HKSTP Incu-Tech Programme

Direct grant & subsidy covering Science Park lab rent, HIL hardware tooling, and R&D milestone gates.

HK$ 1,290,000
02. ITF Research Talent Hub (RTH)

100% salary reimbursement for 2 full-time control systems & marine mechatronics engineers over 18 months.

HK$ 1,450,000
03. Patent Application Grant (PAG)

Covers 90% of up to HK$ 278,000 in PCT and regional patent filings across our 3 core patent families.

HK$ 250,000
LEDGER 03 // PRIVATE EQUITY & INFRASTRUCTURE CO-FINANCING

Staged Private VC & Green Infrastructure Tranches (HKD)

1:1 ITC ESS Matching
Tranche 1 (Now): HK$ 1.5M – 2.0M Angel Working-Capital Float

Covers the HK$ 208,000 net equity gap plus working-capital float ahead of HKSTP and ITF RTH reimbursement cycles to execute Phase 0 SIL and Phase 1 D1 Tolo Harbour sea trials.

Tranche 2 (Month 12): HK$ 10M Seed VC + HK$ 10M ITC ESS Match (HK$ 20M Total)

1:1 matching via HK Innovation & Technology Commission (ESS) to construct the 15m BAYWING-D2 pilot vessel and commission the Stage 1 Sheung Wan 22 kV & CLP cross-harbour charging nodes.

Tranche 3 (Month 26+): Series A & Dual-Utility 22 kV Terminal Scaling

Scales D3–D5 & EF-150 commercial fleets and 22 kV automated MCS charging terminals across all 23 HK routes and 5 GBA corridors in partnership with HK Electric and CLP Power.

Institutional Investment Merits & Engineering Risk Mitigations

STRUCTURAL MOAT, DUAL-UTILITY ALIGNMENT (HKE + CLP) & CAPITAL EFFICIENCY

1. 93.5% Non-Dilutive R&D Leverage & 1:1 ESS Co-Matching

HK$ 2.99M of our HK$ 3.20M Phase 0–1 budget is covered by HKSTP Incu-Tech, ITF RTH, and PAG grants, followed by HK$ 10M 1:1 ITC ESS matching in Phase 2.

2. Dual-Utility 22 kV Grid Alignment (HK Electric + CLP Power Marine eMobility)

Confirmed with HK Electric (21–22 Oct 2026: FFL ≥ +7.0 mPD Concrete Substation & N×1,500 kVA transformers at Sheung Wan) and actively synchronizing Kowloon/NT hubs with CLP Marine eMobility (Teams meeting confirmed for 28 Oct 2026).

3. 78% OPEX Reduction (HK$ 38.22/NM) + Hub-and-Spoke Zero Rural CapEx

Active hydrofoils cut energy burn from HK$ 175.50/NM (diesel) down to HK$ 38.22/NM while unpowered rural piers (Chi Ma Wan, Peng Chau, Tai O) operate as 60-second touch-and-go stops with zero rural grid upgrades.

02. SOVEREIGN HONG KONG R&D // STATUTORY GRANTS & UNIVERSITY RTH

HKSTP Incu-Tech, ITC ESS 1:1 Match, Green Tech Fund & University RTH

01. HKSTP INCU-TECH + PAG HK$ 1,540,000

18-Month Science Park Incubation & Tolo Harbour Trials

Combines HK$ 1,290,000 HKSTP Incu-Tech grant with HK$ 250,000 Patent Application Grant (90% PCT coverage). Structured across 3 milestone gates: Months 1–6 (6-DOF SIL Digital Twin), Months 6–12 (HIL Bench & D1 Assembly), and Months 12–18 (Tolo Harbour autonomous sea trials at 13.4 knots).

02. ITC ENTERPRISE SUPPORT SCHEME (ESS) HK$ 10,000,000 MATCH

HK$ 20.0M Co-Matching for BAYWING-D2 Commercial Pilot

Consultation filed Oct 16, 2026 with the ITC ESS Secretariat to match HK$ 10.0M private seed capital with HK$ 10.0M ESS grant funds—financing D2 human-rated 100Hz flight computer certification and our Sheung Wan fast-charging interface.

03. EEB GREEN TECH FUND (GTF) -168,000 T CO₂/YR

Zero-Emission Marine Transport & 22 kV Charging Hub

Confirmed on the official EEB Green Tech Fund notification list (Oct 16, 2026) for the Q4 2026 application round and applicant webinar under Category (c) Local Companies, targeting 168,000 tonnes/year CO₂ reduction at full fleet scale.

04. ITF RESEARCH TALENT HUB (RTH) HK$ 1,450,000

HKUST Robotics Institute & PolyU Mechatronics Hiring

100% salary coverage (HK$ 725,000 each over 18 months) for two full-time graduates: (1) Flight Control Systems & RTOS Software Engineer and (2) Marine Mechatronics & Hydrofoil Actuation Engineer.

03. SHORE-POWER UTILITIES, LAND ALLOCATION & DNV CLASSIFICATION

Dual-Utility Grid Integration (HKE, CLP, AAHK, LandsD, EEB, EMSD) & DNV HSC Rules

UTILITY PARTNER // CLP POWER (MARINE eMOBILITY DIVISION)

Kowloon, Tuen Mun & Lantau 22 kV Sync (Teams Call 28 Oct)

Following HK Electric’s 22 kV alignment on HK Island, CLP Power’s Marine eMobility division scheduled a Microsoft Teams session for 28 Oct 2026 (10:00 AM) to align high-voltage / BESS nodes at TST, Hung Hom, Tuen Mun, and Tsuen Wan.

AIRPORT FACILITY // AAHK SKYPIER

SkyPier 3.8 MW MCS Routing

AAHK confirmed direct management of SkyPier berths; our 3.8 MW MCS shore-power brief is routed to AAHK’s Engineering & Technology Division.

LAND & POLICY // LANDSD & EEB

Sheung Wan STT & Policy Support

Confirmed by CEDD (22 Oct 2026): LandsD (DLO/HKW&S) leads the Short Term Tenancy (STT) land allocation while EEB leads green transport policy support for our +7.0 mPD terminal.

ELECTRICAL SAFETY // EMSD

800V–1,000V DC & 22 kV Switchgear Safety

Formal acknowledgment received from EMSD for our marine battery architecture, onshore switchgear demarcation, and zero-export grid protection.

CLASSIFICATION // DNV HONG KONG

DNV High-Speed Craft (HSC) Advisory

Backed by a dedicated HK$ 1,500,000 D2 certification budget covering cell-level LFP thermal isolation, dual pod drives, and 100Hz RTOS fail-safe rules.

MARITIME POLICY // HKMPB

Sovereign Green Maritime Hub

Briefed HKMPB Secretariat on cutting ferry energy OPEX by 78% (from HK$ 175.50/NM to HK$ 38.22/NM) while pairing HK flight-control IP with GBA manufacturing.

⚡ LIVE UTILITY BRIEFING MATRIX // CLP TEAMS CALL (28 OCT 10:00 AM) & MACAO DSMM 400V REPLY (27 OCT)

CLP Kowloon/NT 5-Node Grid Synchronization & Macao 400V-to-BESS Step-Up Matrix

Select any CLP Kowloon/New Territories landing node or Macao Ferry Terminal below to inspect its staged feeder requirement, onshore LFP BESS buffer sizing, and cross-harbour load-sharing ratio with our HK Electric Sheung Wan 22 kV Hub.

CLP KOWLOON CROSS-HARBOUR NODE // VH-01, VH-02, VH-03 & VH-04

Tsim Sha Tsui & Hung Hom Ferry Piers (BAYWING-D3 Shuttle)

✓ PHASE 1 ASYMMETRIC RELIEF: 70% CHARGED AT HKE SHEUNG WAN 22kV
PHASE 1 STEADY GRID FEEDER 400V / 350–500 kVA LV
ONSHORE LFP BESS BUFFER 750 kWh – 1.0 MWh BESS
PEAK DC DISPENSE TO BOAT 800 kW – 1.2 MW (3–4m)
PHASE 2+ PERMANENT HV TARGET 11 kV / 22 kV (1×1,500 kVA)
1. Assigned Vessel & Route Frequency: BAYWING-D3 (20m, 120 Pax) // Every 5–8 Mins MTR-Style Frequency
2. Grid Protection & Peak-Shaving Logic: 100% Unidirectional (Zero Export); BESS shaves 70% of 3-minute berth peak
3. Key Engineering Question / Action Item: Confirm CLP 400V LV headroom vs. 11 kV ring proximity at TST & Hung Hom piers (28 Oct Teams Call)
🏛️ 28 OCT 2026 STRATEGIC SYNTHESIS // HKE 22kV + CLP 11kV + MACAO 400V-BESS + GBA CUSTOMS (CIQ)

Twin-Hub Greenfield EV & GBA Passport Control (CIQ) Terminal Architecture

Following our 21–22 Oct alignment with HK Electric, 27 Oct confirmation from Macao DSMM, and 28 Oct engineering session with CLP Marine eMobility (which confirmed that legacy TST Pier cannot be retrofitted due to heritage preservation restrictions), BAYWING has unified its shore-side master plan around dedicated Greenfield EV & Customs Terminals pursued via top-down HKSTP and GBA industrial channels.

KOWLOON GREENFIELD HUB (CLP TERRITORY) // CONFIRMED 28 OCT 2026

Kowloon 11 kV + BESS Greenfield Terminal with Automated GBA Passport Control (CIQ)

✓ BYPASSES TST HERITAGE BLOCKADE & UNLOCKS KOWLOON → GBA / SKYPIER
UTILITY GRID FEEDER CLP 11 kV Ring Feeder
ONSHORE BESS BUFFER 1.5 MWh – 2.0 MWh LFP
BORDER & BAGGAGE FACILITY e-Channel CIQ + Check-In
NEW DIRECT CORRIDORS SkyPier (18m) • Macau • Foshan
1. Why Greenfield Beats Retrofitting: CLP confirmed legacy TST Pier cannot be retrofitted due to heritage rules & zero substation space
2. Electrical & BESS Architecture: CLP 11 kV feeder charges onshore BESS at steady rate; BESS outputs 3.5 MW MCS bursts with zero grid shock
3. Commercial & Passenger Unlock: Kowloon to HKIA SkyPier in 18 mins (faster than MTR) + direct Kowloon to Macau, Zhuhai, Shekou & Foshan
✈️ FULL-STACK INFRASTRUCTURE BUILD // GIS: 22.290175° N, 114.148746° E (SAI FIRE SERVICES ST / SHEUNG WAN LANDING NO. 1)

Sheung Wan 22 kV "Water-Airport" CIQ Terminal, 1.5 MWh BESS & 3.5 MW Mega-Charger

Rather than duplicating costly passport control on the congested Kowloon waterfront, BAYWING concentrates 100% of its cross-border Customs, Immigration, and Quarantine (CIQ) and 22 kV megawatt charging at a single sovereign-grade "Water-Airport" Flagship Hub built over the foreshore/seabed (Cap. 127) at Sheung Wan Landing No. 1 (`22.290175° N, 114.148746° E`)—directly fronting HK Electric's Sheung Wan 132/22 kV Zone Substation and immediately adjacent to the Fire Services Department Hong Kong Island Headquarters.

SUBSYSTEM 01 // GIS SITE GEOMETRY, CAP. 127 RECLAIMED DECK & LAST-MILE MTR LINK

Sheung Wan Landing No. 1 (22.290175° N, 114.148746° E) — Next to Zone Substation & Fire Station

✓ FILED W/ LANDSD & EEB (28 OCT 2026) // CAP. 127 & NOMINAL PTG
WGS84 GIS COORDINATES 22.290175, 114.148746
HKE ZONE SUB & FSD HQ ~50m South / Next Door
MARINE LEGAL PATHWAY Cap. 127 Seabed + $1 PTG
MTR / BUS LAST-MILE LINK 350m Travellator + Shuttle
CAD ARCHITECTURE DIAGRAM // LIVE SUBSYSTEM SCHEMATIC FFL ≥ +7.0 mPD Flood-Resilient Standard
04. VERIFIED DATA ROOM LOG // SEPT–OCT 2026 STAKEHOLDER DISPATCHES (PRIVACY SCRUBBED)

Official Government, Utility & Classification Correspondence Tracker (12 Filings)

Filter all 12 active institutional threads below and click any expandable drawer to inspect the correspondence log (individual email addresses omitted for privacy).